Botex Chainhoist Controller CHC-8

Botex Chainhoist Controller CHC-8

The price is calculated per event days. Choose your event's start and end dates — you pay for those days only.

1 Day

€20,00

Availability by day

Loading…

SKU: BOTEX_CHAINHOIST_CONTROLLER_CHC_8

Botex Chainhoist Controller CHC-8 is a specialized control unit designed to coordinate the operation of chain hoists in event and stage setups. The device provides centralized simultaneous control of multiple hoists, which is essential for precise positioning of large stage elements, screens, and structures. The CHC-8 model is intended for professional event technicians working with stage rigging at concerts, exhibitions, and other large-scale events.
ModelBotex Chainhoist Controller CHC-8
Number of channels8
ApplicationĶēdes pacēlāju (chainhoist) vadība skatuves rigingā
What is the Botex CHC-8 designed for?

The Botex CHC-8 is designed for professional rigging technicians who need to operate multiple chain hoists simultaneously at events – for example, for raising and lowering stage structures, lighting trusses, or screens.

How many hoists can the CHC-8 control?

The CHC-8 (an 8-channel model) supports control of up to 8 independent chainhoist channels, allowing each hoist to be operated individually or in groups.

Is the CHC-8 compatible with chain hoists from different manufacturers?

Compatibility with specific chainhoist models should be verified before rental, as different hoists may vary in their control interface. Rental specialists can help confirm suitability for a particular application.

Does the controller require additional equipment?

A chainhoist controller is typically used together with compatible chain hoists and power distribution equipment. It is recommended to coordinate the full setup according to the technical requirements of the event.

At what types of events is the Botex CHC-8 most commonly used?

The unit is used at concerts, theatre productions, exhibitions, and corporate events where coordinated and safe vertical movement of multiple stage elements is required.